Design and construction of a 285,000 SF precast hybrid parking structure built on a fully operational hospital campus. The five-level, 886-stall facility features an architectural façade composed of multiple materials. The structural skeleton is pre-cast column and beams with cast-in-place decks. Structural skeleton was installed in one mobilization, each piece flown in via crane. PվƵ PվƵed all formwork and placed 7,375 CY of concrete.

Owner
Kaiser
Location
Sacramento, CA
Square Footage
285,000
Architect
Chong Partners (now Stantec)
Structural Engineer
Walker Parking