Projects Archive - Overaa Construction /projects/ Building Community Since 1907 Thu, 11 Jun 2026 17:38:18 +0000 en-US hourly 1 https://wordpress.org/?v=7.0 /wp-content/uploads/2021/07/cropped-favicon-1-150x150.png Projects Archive - Overaa Construction /projects/ 32 32 Secure Laser Laboratory Renovation – Confidential National Laboratory Client /projects/secure-laser-laboratory-renovation-confidential-national-laboratory-client/ Thu, 11 Jun 2026 17:37:55 +0000 /?post_type=projects&p=20927 Renovation of a secure laser laboratory on an occupied federal research campus, performed under strict clean construction protocols. Scope included buildout of new laser labs and associated utilities within the building core, conversion of a utility room and control room, and improvements to adjacent office and technical support space. The facility was engineered and constructed […]

The post Secure Laser Laboratory Renovation – Confidential National Laboratory Client appeared first on Overaa Construction.

]]>
Renovation of a secure laser laboratory on an occupied federal research campus, performed under strict clean construction protocols. Scope included buildout of new laser labs and associated utilities within the building core, conversion of a utility room and control room, and improvements to adjacent office and technical support space. The facility was engineered and constructed to Class 1,000 and Class 10,000 cleanroom standards. Utility systems included low conductivity water, 500kW power, clean dry air, compressed air, nitrogen, and helium. PÕ¾ÊÓÆµ performed all functional testing and commissioning through system serviceability.

The post Secure Laser Laboratory Renovation – Confidential National Laboratory Client appeared first on Overaa Construction.

]]>
New Office Building – Confidential National Laboratory Client /projects/new-office-building-confidential-national-laboratory-client/ Thu, 11 Jun 2026 17:33:10 +0000 /?post_type=projects&p=20925 Construction of a new 22,000 SF single-story Class A office building on an occupied federal research campus. The facility accommodates approximately 100 employees across private offices, conference rooms, collaborative workspaces, and support areas. Structure is precast concrete with steel framing. Site work includes ADA, electric vehicle, and government vehicle parking.

The post New Office Building – Confidential National Laboratory Client appeared first on Overaa Construction.

]]>
Construction of a new 22,000 SF single-story Class A office building on an occupied federal research campus. The facility accommodates approximately 100 employees across private offices, conference rooms, collaborative workspaces, and support areas. Structure is precast concrete with steel framing. Site work includes ADA, electric vehicle, and government vehicle parking.

The post New Office Building – Confidential National Laboratory Client appeared first on Overaa Construction.

]]>
New High Bay Lab Facility – Confidential National Laboratory Client /projects/new-high-bay-lab-facility-confidential-national-laboratory-client/ Thu, 11 Jun 2026 17:24:07 +0000 /?post_type=projects&p=20923 Construction of a new LEED Gold certified high bay research facility on an occupied federal campus. The facility includes a high bay, processing lab, mechanical and electrical rooms, intermediate distribution room, permanent and open office areas, break room, and restrooms with showers. Site work included development of a secured storage yard with gated access. Structure […]

The post New High Bay Lab Facility – Confidential National Laboratory Client appeared first on Overaa Construction.

]]>
Construction of a new LEED Gold certified high bay research facility on an occupied federal campus. The facility includes a high bay, processing lab, mechanical and electrical rooms, intermediate distribution room, permanent and open office areas, break room, and restrooms with showers. Site work included development of a secured storage yard with gated access. Structure is steel framed with metal stud exterior and EIFS finish.

The post New High Bay Lab Facility – Confidential National Laboratory Client appeared first on Overaa Construction.

]]>
Secure Office Building – Confidential National Laboratory Client /projects/secure-office-building-confidential-national-laboratory-client/ Thu, 11 Jun 2026 17:19:09 +0000 /?post_type=projects&p=20921 Construction of a new 28,000 SF LEED Gold certified, two-story secure office building on an occupied federal research campus. The project converted an unused surface parking area into a fully operational facility housing open and private office space, conference and meeting rooms, administrative support areas, break rooms, and dedicated storage areas.

The post Secure Office Building – Confidential National Laboratory Client appeared first on Overaa Construction.

]]>
Construction of a new 28,000 SF LEED Gold certified, two-story secure office building on an occupied federal research campus. The project converted an unused surface parking area into a fully operational facility housing open and private office space, conference and meeting rooms, administrative support areas, break rooms, and dedicated storage areas.

The post Secure Office Building – Confidential National Laboratory Client appeared first on Overaa Construction.

]]>
New Health and Wellness Center – Confidential National Laboratory Client /projects/new-health-and-wellness-center-confidential-national-laboratory-client/ Thu, 11 Jun 2026 17:12:32 +0000 /?post_type=projects&p=20919 Currently under construction, this project involves a new two-story fitness and amenity center designed to serve as a central hub for employee wellness, networking, and social engagement.

The post New Health and Wellness Center – Confidential National Laboratory Client appeared first on Overaa Construction.

]]>
Currently under construction, this project involves a new two-story fitness and amenity center designed to serve as a central hub for employee wellness, networking, and social engagement.

The post New Health and Wellness Center – Confidential National Laboratory Client appeared first on Overaa Construction.

]]>
New Wet Chemistry Facility – Confidential National Laboratory Client /projects/new-wet-chemistry-facility-confidential-national-laboratory-client/ Thu, 11 Jun 2026 17:07:57 +0000 /?post_type=projects&p=20917 Design and construction of a new 13,000 SF mission-critical wet chemistry laboratory supporting advanced isotopic analysis and national security research programs. The single-story facility provides approximately 7,000 SF of specialized laboratory space and 6,000 SF of flexible support and storage, with pressure gradient zoning and activity segregation throughout to eliminate cross-contamination. Scope included full design-build […]

The post New Wet Chemistry Facility – Confidential National Laboratory Client appeared first on Overaa Construction.

]]>
Design and construction of a new 13,000 SF mission-critical wet chemistry laboratory supporting advanced isotopic analysis and national security research programs. The single-story facility provides approximately 7,000 SF of specialized laboratory space and 6,000 SF of flexible support and storage, with pressure gradient zoning and activity segregation throughout to eliminate cross-contamination. Scope included full design-build delivery, site preparation, and underground electrical and mechanical utility installation.

The post New Wet Chemistry Facility – Confidential National Laboratory Client appeared first on Overaa Construction.

]]>
PG&E Potrero Substation /projects/pge-potrero-substation/ Thu, 11 Jun 2026 16:36:38 +0000 /?post_type=projects&p=20898 Construction of a new 15,765 SF two-story electrical control substation adjacent to the existing Potrero Switchyard at Illinois and 23rd Street in San Francisco. The Type IB structure features one above-grade and one below-grade level on an 8,600 SF footprint, with the basement housing electrical control and switchgear equipment replacing the existing substation. Scope included […]

The post PG&E Potrero Substation appeared first on Overaa Construction.

]]>
Construction of a new 15,765 SF two-story electrical control substation adjacent to the existing Potrero Switchyard at Illinois and 23rd Street in San Francisco. The Type IB structure features one above-grade and one below-grade level on an 8,600 SF footprint, with the basement housing electrical control and switchgear equipment replacing the existing substation. Scope included drilled pier soil stabilization, slab on metal deck, living roof, structural steel framing, and precast panels. PÕ¾ÊÓÆµ PÕ¾ÊÓÆµed deck pours, embeds, formwork, and doors, frames, and hardware.

The post PG&E Potrero Substation appeared first on Overaa Construction.

]]>
PG&E Embarcadero Substation /projects/pge-embarcadero-substation/ Thu, 11 Jun 2026 16:23:28 +0000 /?post_type=projects&p=20891 Construction of a new 16,000 SF Gas Insulated Substation (GIS) in downtown San Francisco, providing power infrastructure to support new residential development and regional transit serving the Transbay corridor. The three-level facility features a 6,000 SF footprint with mat slab foundation, precast walls, and structural steel framing, with PÕ¾ÊÓÆµ PÕ¾ÊÓÆµing site concrete and precast tilt-up […]

The post PG&E Embarcadero Substation appeared first on Overaa Construction.

]]>
Construction of a new 16,000 SF Gas Insulated Substation (GIS) in downtown San Francisco, providing power infrastructure to support new residential development and regional transit serving the Transbay corridor. The three-level facility features a 6,000 SF footprint with mat slab foundation, precast walls, and structural steel framing, with PÕ¾ÊÓÆµ PÕ¾ÊÓÆµing site concrete and precast tilt-up work.

The post PG&E Embarcadero Substation appeared first on Overaa Construction.

]]>
PG&E Egbert Switchyard Station /projects/pge-egbert-switchyard-station/ Mon, 08 Jun 2026 21:39:30 +0000 /?post_type=projects&p=20886 This in progress project involves construction of a new Gas Insulated Substation (GIS) strengthening PG&E’s critical power infrastructure and improving grid reliability for the City and County of San Francisco. The facility will connect to the existing 230 kV system via new underground single-circuit transmission lines, enabling power routing to San Francisco in the event […]

The post PG&E Egbert Switchyard Station appeared first on Overaa Construction.

]]>
This in progress project involves construction of a new Gas Insulated Substation (GIS) strengthening PG&E’s critical power infrastructure and improving grid reliability for the City and County of San Francisco. The facility will connect to the existing 230 kV system via new underground single-circuit transmission lines, enabling power routing to San Francisco in the event of a major disaster. Scope includes the GIS building housing electrical control switching gear, site preparation, coordination with PG&E’s high-voltage contractor, architectural metal panel screening, and site improvements.

The post PG&E Egbert Switchyard Station appeared first on Overaa Construction.

]]>
Energy Corridor – Confidential National Laboratory Client /projects/energy-cooridor/ Mon, 04 May 2026 20:20:49 +0000 /?post_type=projects&p=20846 A new 3,500 LF utility corridor will act as the campus nerve center to provide utilities (electrical, hydronic, water systems) for future expansion for a repeat laboratory client.

The post Energy Corridor – Confidential National Laboratory Client appeared first on Overaa Construction.

]]>
A new 3,500 LF utility corridor will act as the campus nerve center to provide utilities (electrical, hydronic, water systems) for future expansion for a repeat laboratory client.

The post Energy Corridor – Confidential National Laboratory Client appeared first on Overaa Construction.

]]>
Special Integration Laboratory – Confidential National Laboratory Client /projects/special-integration-laboratory/ Mon, 04 May 2026 20:13:42 +0000 /?post_type=projects&p=20842 A new, 6,000 SF Special Integration Laboratory for a confidential client in California.

The post Special Integration Laboratory – Confidential National Laboratory Client appeared first on Overaa Construction.

]]>
A new, 6,000 SF Special Integration Laboratory for a confidential client in California.

The post Special Integration Laboratory – Confidential National Laboratory Client appeared first on Overaa Construction.

]]>
Alameda County Fire Station #22 /projects/alameda-county-fire-station-22/ Thu, 26 Feb 2026 19:40:01 +0000 /?post_type=projects&p=20510 Currently in design/preconstruction, this project will provide a state-of-the-art replacement for Fire Station 22 in the growing community of San Lorenzo. This project will transform a vacant lot into a modern, single-story facility designed to house a Type I Engine company.

The post Alameda County Fire Station #22 appeared first on Overaa Construction.

]]>
Currently in design/preconstruction, this project will provide a state-of-the-art replacement for Fire Station 22 in the growing community of San Lorenzo. This project will transform a vacant lot into a modern, single-story facility designed to house a Type I Engine company.

The post Alameda County Fire Station #22 appeared first on Overaa Construction.

]]>