Lab & Technology Archives - Overaa Construction /markets/lifescience/ Building Community Since 1907 Thu, 11 Jun 2026 17:38:18 +0000 en-US hourly 1 https://wordpress.org/?v=7.0 /wp-content/uploads/2021/07/cropped-favicon-1-150x150.png Lab & Technology Archives - Overaa Construction /markets/lifescience/ 32 32 Secure Laser Laboratory Renovation – Confidential National Laboratory Client /projects/secure-laser-laboratory-renovation-confidential-national-laboratory-client/ Thu, 11 Jun 2026 17:37:55 +0000 /?post_type=projects&p=20927 Renovation of a secure laser laboratory on an occupied federal research campus, performed under strict clean construction protocols. Scope included buildout of new laser labs and associated utilities within the building core, conversion of a utility room and control room, and improvements to adjacent office and technical support space. The facility was engineered and constructed […]

The post Secure Laser Laboratory Renovation – Confidential National Laboratory Client appeared first on Overaa Construction.

]]>
Renovation of a secure laser laboratory on an occupied federal research campus, performed under strict clean construction protocols. Scope included buildout of new laser labs and associated utilities within the building core, conversion of a utility room and control room, and improvements to adjacent office and technical support space. The facility was engineered and constructed to Class 1,000 and Class 10,000 cleanroom standards. Utility systems included low conductivity water, 500kW power, clean dry air, compressed air, nitrogen, and helium. PÕ¾ÊÓÆµ performed all functional testing and commissioning through system serviceability.

The post Secure Laser Laboratory Renovation – Confidential National Laboratory Client appeared first on Overaa Construction.

]]>
New Office Building – Confidential National Laboratory Client /projects/new-office-building-confidential-national-laboratory-client/ Thu, 11 Jun 2026 17:33:10 +0000 /?post_type=projects&p=20925 Construction of a new 22,000 SF single-story Class A office building on an occupied federal research campus. The facility accommodates approximately 100 employees across private offices, conference rooms, collaborative workspaces, and support areas. Structure is precast concrete with steel framing. Site work includes ADA, electric vehicle, and government vehicle parking.

The post New Office Building – Confidential National Laboratory Client appeared first on Overaa Construction.

]]>
Construction of a new 22,000 SF single-story Class A office building on an occupied federal research campus. The facility accommodates approximately 100 employees across private offices, conference rooms, collaborative workspaces, and support areas. Structure is precast concrete with steel framing. Site work includes ADA, electric vehicle, and government vehicle parking.

The post New Office Building – Confidential National Laboratory Client appeared first on Overaa Construction.

]]>
New High Bay Lab Facility – Confidential National Laboratory Client /projects/new-high-bay-lab-facility-confidential-national-laboratory-client/ Thu, 11 Jun 2026 17:24:07 +0000 /?post_type=projects&p=20923 Construction of a new LEED Gold certified high bay research facility on an occupied federal campus. The facility includes a high bay, processing lab, mechanical and electrical rooms, intermediate distribution room, permanent and open office areas, break room, and restrooms with showers. Site work included development of a secured storage yard with gated access. Structure […]

The post New High Bay Lab Facility – Confidential National Laboratory Client appeared first on Overaa Construction.

]]>
Construction of a new LEED Gold certified high bay research facility on an occupied federal campus. The facility includes a high bay, processing lab, mechanical and electrical rooms, intermediate distribution room, permanent and open office areas, break room, and restrooms with showers. Site work included development of a secured storage yard with gated access. Structure is steel framed with metal stud exterior and EIFS finish.

The post New High Bay Lab Facility – Confidential National Laboratory Client appeared first on Overaa Construction.

]]>
Secure Office Building – Confidential National Laboratory Client /projects/secure-office-building-confidential-national-laboratory-client/ Thu, 11 Jun 2026 17:19:09 +0000 /?post_type=projects&p=20921 Construction of a new 28,000 SF LEED Gold certified, two-story secure office building on an occupied federal research campus. The project converted an unused surface parking area into a fully operational facility housing open and private office space, conference and meeting rooms, administrative support areas, break rooms, and dedicated storage areas.

The post Secure Office Building – Confidential National Laboratory Client appeared first on Overaa Construction.

]]>
Construction of a new 28,000 SF LEED Gold certified, two-story secure office building on an occupied federal research campus. The project converted an unused surface parking area into a fully operational facility housing open and private office space, conference and meeting rooms, administrative support areas, break rooms, and dedicated storage areas.

The post Secure Office Building – Confidential National Laboratory Client appeared first on Overaa Construction.

]]>
New Health and Wellness Center – Confidential National Laboratory Client /projects/new-health-and-wellness-center-confidential-national-laboratory-client/ Thu, 11 Jun 2026 17:12:32 +0000 /?post_type=projects&p=20919 Currently under construction, this project involves a new two-story fitness and amenity center designed to serve as a central hub for employee wellness, networking, and social engagement.

The post New Health and Wellness Center – Confidential National Laboratory Client appeared first on Overaa Construction.

]]>
Currently under construction, this project involves a new two-story fitness and amenity center designed to serve as a central hub for employee wellness, networking, and social engagement.

The post New Health and Wellness Center – Confidential National Laboratory Client appeared first on Overaa Construction.

]]>
New Wet Chemistry Facility – Confidential National Laboratory Client /projects/new-wet-chemistry-facility-confidential-national-laboratory-client/ Thu, 11 Jun 2026 17:07:57 +0000 /?post_type=projects&p=20917 Design and construction of a new 13,000 SF mission-critical wet chemistry laboratory supporting advanced isotopic analysis and national security research programs. The single-story facility provides approximately 7,000 SF of specialized laboratory space and 6,000 SF of flexible support and storage, with pressure gradient zoning and activity segregation throughout to eliminate cross-contamination. Scope included full design-build […]

The post New Wet Chemistry Facility – Confidential National Laboratory Client appeared first on Overaa Construction.

]]>
Design and construction of a new 13,000 SF mission-critical wet chemistry laboratory supporting advanced isotopic analysis and national security research programs. The single-story facility provides approximately 7,000 SF of specialized laboratory space and 6,000 SF of flexible support and storage, with pressure gradient zoning and activity segregation throughout to eliminate cross-contamination. Scope included full design-build delivery, site preparation, and underground electrical and mechanical utility installation.

The post New Wet Chemistry Facility – Confidential National Laboratory Client appeared first on Overaa Construction.

]]>
Energy Corridor – Confidential National Laboratory Client /projects/energy-cooridor/ Mon, 04 May 2026 20:20:49 +0000 /?post_type=projects&p=20846 A new 3,500 LF utility corridor will act as the campus nerve center to provide utilities (electrical, hydronic, water systems) for future expansion for a repeat laboratory client.

The post Energy Corridor – Confidential National Laboratory Client appeared first on Overaa Construction.

]]>
A new 3,500 LF utility corridor will act as the campus nerve center to provide utilities (electrical, hydronic, water systems) for future expansion for a repeat laboratory client.

The post Energy Corridor – Confidential National Laboratory Client appeared first on Overaa Construction.

]]>
Special Integration Laboratory – Confidential National Laboratory Client /projects/special-integration-laboratory/ Mon, 04 May 2026 20:13:42 +0000 /?post_type=projects&p=20842 A new, 6,000 SF Special Integration Laboratory for a confidential client in California.

The post Special Integration Laboratory – Confidential National Laboratory Client appeared first on Overaa Construction.

]]>
A new, 6,000 SF Special Integration Laboratory for a confidential client in California.

The post Special Integration Laboratory – Confidential National Laboratory Client appeared first on Overaa Construction.

]]>
LBNL Welcome Center /projects/lbnl-welcome-center/ Thu, 22 Jun 2023 18:45:11 +0000 /?post_type=projects&p=15592 Preconstruction and construction services for the new LEED Gold-designed facility that will house the new central cafeteria, health clinic, badging office, and conference center for the 4000+ employees at LBNL.  Scope also includes a central hub for transportation new underground utilities and extensive sitework. Located near the Hayward fault, seismic safety considerations are extensive and […]

The post LBNL Welcome Center appeared first on Overaa Construction.

]]>
Preconstruction and construction services for the new LEED Gold-designed facility that will house the new central cafeteria, health clinic, badging office, and conference center for the 4000+ employees at LBNL.  Scope also includes a central hub for transportation new underground utilities and extensive sitework. Located near the Hayward fault, seismic safety considerations are extensive and work includes site grading, new soldier pile and lagging system, cast-in-place retaining walls, and a new stitch pier wall.

The post LBNL Welcome Center appeared first on Overaa Construction.

]]>
Viral Rickettsial Lab /projects/viral-rickettsial-lab/ Tue, 07 Dec 2021 22:08:47 +0000 /?post_type=projects&p=12691 Upgrade and expansion of an existing Biosafety Level-3 (BSL-3) Laboratory located on the third floor of the California Department of General PÕ¾ÊÓÆµ laboratory facility.  Approximately 2,000 SF of existing laboratory space was demolished and replaced with a new BSL-3 laboratory. The new facility features three laboratories and one work room that has infrastructure in place […]

The post Viral Rickettsial Lab appeared first on Overaa Construction.

]]>
Upgrade and expansion of an existing Biosafety Level-3 (BSL-3) Laboratory located on the third floor of the California Department of General PÕ¾ÊÓÆµ laboratory facility.  Approximately 2,000 SF of existing laboratory space was demolished and replaced with a new BSL-3 laboratory. The new facility features three laboratories and one work room that has infrastructure in place to convert to a future fourth laboratory. It includes a staging area with freezer space and an autoclave, a decontamination room, a clean autoclave room, changing rooms, and valve room to house mechanical equipment. Rooftop scope covered removal and replacement of air handlers, filter bank, and exhaust fans, with associated structural, architectural, and waterproofing work. A great deal of coordination was required on this project as it took place within an operating building, and dealt with active systems of critical importance to adjacent laboratory rooms.

The post Viral Rickettsial Lab appeared first on Overaa Construction.

]]>
Tosco Quality Assurance Laboratory /projects/tosco-quality-assurance-laboratory/ Mon, 24 May 2021 11:06:53 +0000 http://overaa-construction.local/?projects=tosco-quality-assurance-laboratory Construction included installing high purity stainless steel process piping, fume hoods, laboratory equipment, mechanical systems with HEPA filters, and an air balancing system. Scope also covered new offices, a cold room, a loading area with epoxy-coated flooring, and special trench drains. We also relocated sensitive laboratory equipment into the new facility.

The post Tosco Quality Assurance Laboratory appeared first on Overaa Construction.

]]>
Construction included installing high purity stainless steel process piping, fume hoods, laboratory equipment, mechanical systems with HEPA filters, and an air balancing system. Scope also covered new offices, a cold room, a loading area with epoxy-coated flooring, and special trench drains. We also relocated sensitive laboratory equipment into the new facility.

The post Tosco Quality Assurance Laboratory appeared first on Overaa Construction.

]]>
Novartis (Chiron Corp) Emeryville 3 Laboratory Remodels /projects/novartis-chiron-corp-emeryville-3-laboratory-remodels/ /projects/novartis-chiron-corp-emeryville-3-laboratory-remodels/#respond Mon, 24 May 2021 11:03:51 +0000 http://overaa-construction.local/?projects=novartis-chiron-corp-emeryville-3-laboratory-remodels Laboratory remodels and one office remodel, including cold rooms, specialized mechanical systems and special floor coatings.

The post Novartis (Chiron Corp) Emeryville 3 Laboratory Remodels appeared first on Overaa Construction.

]]>
Laboratory remodels and one office remodel, including cold rooms, specialized mechanical systems and special floor coatings.

The post Novartis (Chiron Corp) Emeryville 3 Laboratory Remodels appeared first on Overaa Construction.

]]>
/projects/novartis-chiron-corp-emeryville-3-laboratory-remodels/feed/ 0