Education Archives - Overaa Construction /markets/education/ Building Community Since 1907 Wed, 29 Apr 2026 19:46:59 +0000 en-US hourly 1 https://wordpress.org/?v=7.0 /wp-content/uploads/2021/07/cropped-favicon-1-150x150.png Education Archives - Overaa Construction /markets/education/ 32 32 Las Positas College Public Safety Complex & Advanced Manufacturing Transportation Facility /projects/las-positas-college-public-safety-complex-advanced-manufacturing-transportation-facility/ Wed, 02 Feb 2022 21:25:56 +0000 /?post_type=projects&p=12905 Preconstruction and construction services for the new Public Safety Complex (PSC) and Advanced Manufacturing and Transportation (AMT) Buildings, which are co-located to allow for shared linkages between programs, classrooms, and training spaces. The PSC features a 2,400 SF, three-story fire training tower, EMS Simulation Lab and Situation Rooms, Fire Training with “Class A” burn areas, […]

The post Las Positas College Public Safety Complex & Advanced Manufacturing Transportation Facility appeared first on Overaa Construction.

]]>
Preconstruction and construction services for the new Public Safety Complex (PSC) and Advanced Manufacturing and Transportation (AMT) Buildings, which are co-located to allow for shared linkages between programs, classrooms, and training spaces. The PSC features a 2,400 SF, three-story fire training tower, EMS Simulation Lab and Situation Rooms, Fire Training with “Class A” burn areas, and Fire Training Apparatus. The AMT houses an automotive tech facility, welding lab, classrooms and lab spaces. LEED Silver and Award of Merit Winner in the Higher Education/Research category by Engineering News Record (ENR).

The post Las Positas College Public Safety Complex & Advanced Manufacturing Transportation Facility appeared first on Overaa Construction.

]]>
San Leandro High School New Gymnasium /projects/san-leandro-high-school-new-gymnasium/ Thu, 22 Jun 2023 20:46:29 +0000 /?post_type=projects&p=15606 Preconstruction and construction services for the new state-of-the art gymnasium for San Leandro Unified School District. The 55,000 square foot facility features three courts and approximately 3,000 seats as well as academic and athletic support spaces. Scope included site improvements and demolition of an existing gymnasium on campus.

The post San Leandro High School New Gymnasium appeared first on Overaa Construction.

]]>
Preconstruction and construction services for the new state-of-the art gymnasium for San Leandro Unified School District. The 55,000 square foot facility features three courts and approximately 3,000 seats as well as academic and athletic support spaces. Scope included site improvements and demolition of an existing gymnasium on campus.

The post San Leandro High School New Gymnasium appeared first on Overaa Construction.

]]>
Isaac R. Montañez Elementary School & Middle School Addition /projects/lone-tree-school-brentwood/ Thu, 22 Jun 2023 21:15:14 +0000 /?post_type=projects&p=15632 Design and construction of the phased project. Phase 1 included the 66,000 SF new elementary school campus with classrooms, admin offices, a kitchen, a multipurpose room, a library, and extensive sitework. Sitework consisted of vehicle parking, student and bus drop-offs, play fields, playground area, a running track, and street improvements. Phase 2 was the middle […]

The post Isaac R. Montañez Elementary School & Middle School Addition appeared first on Overaa Construction.

]]>
Design and construction of the phased project. Phase 1 included the 66,000 SF new elementary school campus with classrooms, admin offices, a kitchen, a multipurpose room, a library, and extensive sitework. Sitework consisted of vehicle parking, student and bus drop-offs, play fields, playground area, a running track, and street improvements. Phase 2 was the middle school addition with new classrooms and gym wing, daycare facility, science room, locker rooms, gym, play fields, and parking lots. Statewide Educational Wrap-Up Program (SEWUP) Safety Recognition Award winner.

The post Isaac R. Montañez Elementary School & Middle School Addition appeared first on Overaa Construction.

]]>
College of Alameda New Center for Liberal Arts /projects/college-of-alameda-new-center-for-liberal-arts/ /projects/college-of-alameda-new-center-for-liberal-arts/#respond Mon, 24 May 2021 10:51:26 +0000 http://overaa-construction.local/?projects=college-of-alameda-new-center-for-liberal-arts Design and construction of the new Center for Liberals Arts at the occupied College of Alameda campus. The 53,000 SF facility features two specialized buildings joined by a central atrium. A two-story administration wing houses conference rooms, offices spaces, seminar rooms, and Dean’s offices. A three-story classroom building houses lecture rooms, apparel design/sewing/arts laboratories, gallery, […]

The post College of Alameda New Center for Liberal Arts appeared first on Overaa Construction.

]]>
Design and construction of the new Center for Liberals Arts at the occupied College of Alameda campus. The 53,000 SF facility features two specialized buildings joined by a central atrium. A two-story administration wing houses conference rooms, offices spaces, seminar rooms, and Dean’s offices. A three-story classroom building houses lecture rooms, apparel design/sewing/arts laboratories, gallery, cafe and flexible learning spaces. A grand two-story atrium ties these buildings together, providing a warm community multipurpose space equipped with audio visual and lighting for art gallery or special exhibit events on campus. Structurally the new building is supported by deep concrete piles and import fill.  Scope also covered site work and utility relocation.

The post College of Alameda New Center for Liberal Arts appeared first on Overaa Construction.

]]>
/projects/college-of-alameda-new-center-for-liberal-arts/feed/ 0
Kennedy High School Modernization /projects/kennedy-high-school-modernization/ Mon, 27 Jan 2025 19:16:28 +0000 /?post_type=projects&p=18691 Currently in preconstruction, this lease-leaseback project covers the transformation of the entire Kennedy High School campus in Richmond, CA. Phase 1 includes demolition of the existing Classroom/Administration Building and the Arts & Crafts/Health Building and construction of the New Classroom/Administration (including Health and Wellness Clinic) and Student Center, as well as site work. Phase 2 […]

The post Kennedy High School Modernization appeared first on Overaa Construction.

]]>
Currently in preconstruction, this lease-leaseback project covers the transformation of the entire Kennedy High School campus in Richmond, CA.

Phase 1 includes demolition of the existing Classroom/Administration Building and the Arts & Crafts/Health Building and construction of the New Classroom/Administration (including Health and Wellness Clinic) and Student Center, as well as site work.

Phase 2 consists of the modernization of existing Library/Book Storage/Faculty Lounge, Science Classrooms, Career Technical Education programs, Gymnasium, and Multi Use Classrooms and Labs, as well as related site work.

Phase 3 includes removal of existing temporary facilities and construction of site improvements including athletic fields, play courts, parking, hardscape, landscaping, and related site work.

The post Kennedy High School Modernization appeared first on Overaa Construction.

]]>
Piedmont High School STEAM Building /projects/piedmont-high-school-steam-theater/ /projects/piedmont-high-school-steam-theater/#respond Mon, 24 May 2021 10:49:23 +0000 http://overaa-construction.local/?projects=piedmont-high-school-steam-theater This phased, occupied campus project included preconstruction and construction services for the new 42,700 SF, three-story STEAM Classroom Building that houses classrooms, labs, admin offices, collaborative spaces, an equipment preparation room, and a walkout basement. The building is designed to achieve Net-Zero energy.      

The post Piedmont High School STEAM Building appeared first on Overaa Construction.

]]>
This phased, occupied campus project included preconstruction and construction services for the new 42,700 SF, three-story STEAM Classroom Building that houses classrooms, labs, admin offices, collaborative spaces, an equipment preparation room, and a walkout basement. The building is designed to achieve Net-Zero energy.

 

 

 

The post Piedmont High School STEAM Building appeared first on Overaa Construction.

]]>
/projects/piedmont-high-school-steam-theater/feed/ 0
Piedmont High School Alan Harvey Theater /projects/piedmont-high-school-alan-harvey-theater/ Thu, 06 Jan 2022 20:48:35 +0000 /?post_type=projects&p=12832 This phased, occupied campus project included preconstruction and construction services for the new new 22,700 SF theater complete with stage, 452 seats, drama classroom, green room, restrooms, conference room, and department offices.  The new theater features a large, state-of-the-art auditorium with recessed tiered concrete seating structure, orchestra pits, acoustical paneling, modern A/V system, sound control […]

The post Piedmont High School Alan Harvey Theater appeared first on Overaa Construction.

]]>
This phased, occupied campus project included preconstruction and construction services for the new new 22,700 SF theater complete with stage, 452 seats, drama classroom, green room, restrooms, conference room, and department offices.  The new theater features a large, state-of-the-art auditorium with recessed tiered concrete seating structure, orchestra pits, acoustical paneling, modern A/V system, sound control booth, rigging, curtains, and smoke hatches. Sound-rated acoustical doors and acoustic treatments allow performances in the main auditorium and performances in the smaller drama performance space without sound transfer. Radiant floor heating and cooling utilized. There is a level walk path from the back of the auditorium, through its center, to the stage which provides enhanced accessibility and avoids wheel chair lifts. The building is designed for net zero certification.

The post Piedmont High School Alan Harvey Theater appeared first on Overaa Construction.

]]>
University of California, Berkeley Cal Beach Volleyball Complex /projects/university-of-california-berkeley-cal-beach-volleyball-complex/ Fri, 30 Jan 2026 21:15:16 +0000 /?post_type=projects&p=20410 Currently in construction, this project will provide a state-of-the-art home for Cal Athletics beach volleyball that also serves as a welcoming gateway to the campus park. The project includes a five-court sand volleyball complex with berm seating for approximately 500 spectators and a 2,900 SF team building featuring mass timber elements, locker rooms and restrooms. Spectator […]

The post University of California, Berkeley Cal Beach Volleyball Complex appeared first on Overaa Construction.

]]>
Currently in construction, this project will provide a state-of-the-art home for Cal Athletics beach volleyball that also serves as a welcoming gateway to the campus park. The project includes a five-court sand volleyball complex with berm seating for approximately 500 spectators and a 2,900 SF team building featuring mass timber elements, locker rooms and restrooms. Spectator amenities include drinking fountains and public restrooms.

The post University of California, Berkeley Cal Beach Volleyball Complex appeared first on Overaa Construction.

]]>
Coliseum College Preparatory Academy New Classroom Building & Gym /projects/coliseum-college-preparatory-academy-new-classroom-building-gym/ Fri, 30 Jan 2026 21:16:00 +0000 /?post_type=projects&p=20404 This progressive design-build project includes a new single-story gymnasium and a two-story classroom building with 14 standard classrooms and two specialized laboratory classrooms. The scope also includes reconfiguring the existing parking lot, upgrading campus infrastructure, demolishing the existing gymnasium, and creating enhanced outdoor spaces with new landscaping, seating, and activity areas.

The post Coliseum College Preparatory Academy New Classroom Building & Gym appeared first on Overaa Construction.

]]>
This progressive design-build project includes a new single-story gymnasium and a two-story classroom building with 14 standard classrooms and two specialized laboratory classrooms. The scope also includes reconfiguring the existing parking lot, upgrading campus infrastructure, demolishing the existing gymnasium, and creating enhanced outdoor spaces with new landscaping, seating, and activity areas.

The post Coliseum College Preparatory Academy New Classroom Building & Gym appeared first on Overaa Construction.

]]>
John Swett Elementary School /projects/john-swett-elementary-school/ Thu, 22 Jun 2023 21:01:36 +0000 /?post_type=projects&p=15618 This design build elementary school campus project included a 52,539 square foot classroom building with both kindergarten classrooms and elementary classrooms, a 1,036 SF kitchen, and a multipurpose room. Exterior improvements include new landscaping and play areas. Construction took place in two increments: the first was demolition, site grading, electrical infrastructure and retaining walls. Increment […]

The post John Swett Elementary School appeared first on Overaa Construction.

]]>
This design build elementary school campus project included a 52,539 square foot classroom building with both kindergarten classrooms and elementary classrooms, a 1,036 SF kitchen, and a multipurpose room. Exterior improvements include new landscaping and play areas. Construction took place in two increments: the first was demolition, site grading, electrical infrastructure and retaining walls. Increment 2 was phased construction of the new building and parking lot.

The post John Swett Elementary School appeared first on Overaa Construction.

]]>
Roosevelt Middle School Modernization /projects/roosevelt-middle-school-modernization/ Wed, 03 Apr 2024 20:36:52 +0000 /?post_type=projects&p=17082 Preconstruction and construction services for the modernization of the main classroom building and structural upgrade to the theater to meet current safety guidelines, as well as general improvements to the learning spaces throughout the building. Scope also includes Interim Housing fit out and site utilities, as well as site prep work for the permanent Modular […]

The post Roosevelt Middle School Modernization appeared first on Overaa Construction.

]]>
Preconstruction and construction services for the modernization of the main classroom building and structural upgrade to the theater to meet current safety guidelines, as well as general improvements to the learning spaces throughout the building. Scope also includes Interim Housing fit out and site utilities, as well as site prep work for the permanent Modular Science & Restroom Buildings including earthwork and concrete foundation, fit out and site utilities.

The post Roosevelt Middle School Modernization appeared first on Overaa Construction.

]]>
Saint Mary’s College Recreation Center & Swimming Pool /projects/saint-marys-college-recreation-center-swimming-pool/ Mon, 24 May 2021 10:57:03 +0000 http://overaa-construction.local/?projects=saint-marys-college-recreation-center-swimming-pool 64,000 SF new recreation center which supports the College’s Division I athletic programs and is the centerpiece for its new athletic corridor. The main building includes three full size indoor courts for multiple sports, plus weight training and yoga room. Scope also covered a rock climbing wall, fitness rooms, men and women locker rooms, conference […]

The post Saint Mary’s College Recreation Center & Swimming Pool appeared first on Overaa Construction.

]]>
64,000 SF new recreation center which supports the College’s Division I athletic programs and is the centerpiece for its new athletic corridor. The main building includes three full size indoor courts for multiple sports, plus weight training and yoga room. Scope also covered a rock climbing wall, fitness rooms, men and women locker rooms, conference rooms, multipurpose room, and lobby. A collegiate level pool complex was also included. The mechanical, electrical, and plumbing as well as the pool was delivered through design-build.

The post Saint Mary’s College Recreation Center & Swimming Pool appeared first on Overaa Construction.

]]>